We – EPG Team the greatest worm gearbox, couplings and gears manufacturing facility in China with 5 diverse branches. For much more information: Mobile/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778083988828 /
XIHU (WEST LAKE) DIS.HUA Chain Team is the most professional producer of electricity transmission in China, production roller chains, ept sprockets, motorcycle sprockets, casting sprockets, various kind of couplings, pulleys, taper bushes, loc ept gadgets, gears, shafts, CNC precision elements and so on.
We adopt good quality raw substance and rigorous with DIN, ANSI, JIS common ect, We have skilled quality conrol staff, complet gear, advanaced technological innovation. In 1999, Xihu (West Lake) Dis.hua obtained ISO9001 Certification of Good quality Assurance Method, in addition to, the company also devotes itselt o environmental protection, In2002, it also acquired ISO14001 Certificate of Surroundings Administration Program.
ROLLER CONVEYOR CHAIN(M Sequence)
DUNPAI CHAIN NO.
M80F8-S-eighty
M80F9-S-80
M80F3-P-one hundred twenty five
M80F4-A-a hundred
M80F6-P-75
M80F8-B-100
M80F8-B-eighty
M80F4-B-a hundred twenty five
M80F8-B-one hundred twenty five
M80F4-B-one hundred
Product name | Roller Conveyor Chain M80A2F1-F-a hundred and sixty |
Materials Available | one. Stainless Steel: SS201, SS303, SS304, SS316, SS416, SS420 |
two. Steel:C45(K1045), C46(K1046),C20 | |
three. Brass:C36000 ( C26800), C37700 ( HPb59), C38500( HPb58), C27200(CuZn37), C28000(CuZn40) | |
4. Bronze: C51000, C52100, C54400, etc | |
5. Iron: 1213, 12L14,1215 | |
six. Aluminum: Al6061, Al6063 | |
7.OEM according to your request | |
Surface area Therapy | Annealing, natural anodization, heat treatment, polishing, nickel plating, chrome plating, znic plating,yellow passivation, gold passivation, satin, Black area painted and many others. |
Products Available | sprockt chains, pulley, shafts(axles, spline shafts, dart shafts),gears (pinions, wheels gear rack) bearing, bearing seat, bushing, coupling, lock assembly and so forth. |
Processing Method | CNC machining, punch,turning, milling, drilling, grinding, broaching, welding and assembly |
QC : | Technicians self-check in production,ultimate-verify prior to bundle by skilled Quality inspector |
Measurement | Drawings |
Package | Wooden Circumstance/Container and pallet, or as per customized specifications |
Certificate | ISO9001:2008 , ISO14001:2001,ISO/TS 16949:2009 |
Edge | Quality 1st Provider exceptional , Advanced tools,Experienced staff,Perfect testing equipment |
Lead Time | 15-25days samples. 30-45days offcial order |
/ The use of authentic tools manufacturer’s (OEM) part figures or emblems , e.g. CASE® and John Deere® are for reference needs only and for indicating solution use and compatibility. Our business and the outlined substitute areas contained herein are not sponsored, authorized, or produced by the OEM. /